24
Hours of Operation
3000
Rental Items in Fleet
115
Peterbilts in Fleet
WELL TESTING & FLOWBACK
OFT Well Testing performance exceeds expectations in Drillout/Cleanout support, frac support, flowback and pipe line testing and bleed offs.
- Frac Support
- Frac Recovery & Flowback Services
- Production Testing
- AOF & Multi-Point Tests
- Snubbing Support
- Drill Outs
- Production & In-Line Testing
- Bleed-Offs & Clean Outs
- Critical Sour (H2S) & LPG Packages
EQUIPMENT
OFT Well Testing Equipment and Accessory Fleet includes:
- 720 PSI P-Tank
- 300 PSI Dual Filter Pod
- Flare Stack
- 3″ 206 Iron
- 2″ 1502 Iron
- Dual Plug Catcher